VI

AHU MANUFACTURED IN HANOI
DELIVERED IN 2-4 WEEKS

No waiting 8-16 weeks for imports. 100% customized to your specs, full FAT testing before delivery.

6
years manufacturing
150+
successful projects
100+
trusted partners
8
specialized production areas

DURATE PRODUCTS

AHU

Air handling units for cleanrooms and factories: standard, 100% fresh air, dehumidification and heat recovery — floor-mounted, ceiling-mounted and outdoor designs.

View details

ACU

Air clean units for dust-controlled areas: ductwork connection, direct blowing and raised-floor blowing, matched to each room's cleanliness class.

View details

CHILLER

Air-cooled and water-cooled water chillers with scroll or screw compressors, in a flexible capacity range for factories and industrial buildings.

View details

SHORTEN AHU LEAD TIME — ACCELERATE PROJECT PROGRESS

IMPORTED AHU
  • Delivery time of 8–16 weeks
  • Dependent on shipping and import schedules
  • Hard to change configuration when new project requirements arise
  • Replacement parts must wait on import
  • Progress easily affected by the supply chain
DURATE AHU
  • Manufactured in Hanoi – Delivered in just 2–4 weeks
  • Full control over the production plan and handover date
  • Flexible configuration changes to match actual requirements
  • Parts in stock at the factory for fast support
  • Guaranteed progress for projects on an urgent schedule

AHU IMPLEMENTATION PROCESS WITH DURATE

1

Receive technical requirements

Send airflow, external static pressure, dimensions, configuration or project drawings.

2

Solution consulting & quotation within 24 hours

Our engineers analyse the requirements, propose the optimal configuration and send a fast quotation.

3

Manufacturing to exact spec

Equipment is manufactured at the Durate factory, and customers may supervise the fabrication directly.

4

FAT testing & handover

Performance is verified before ex-works delivery, with full technical documents, FAT records and operating instructions handed over.

FEATURED PROJECTS

Cho Ray Hospital project
Cho Ray Hospital
AHU supply
Mebiphar pharmaceutical plant project
Mebiphar
Medical Pharmaceutical and Biological One Member Co., Ltd — AHU supply for the GMP-WHO standard pharmaceutical plant project
Doosan Electro-Materials Vietnam factory project
Doosan Electro-Materials Vietnam
ACU supply for the printed circuit board material factory project

INSIDE THE DURATE FACTORY

CLIENT TESTIMONIALS

“Maintaining a controlled production environment is fundamental in the pharmaceutical industry. Durate delivered an HVAC solution that meets our requirements for temperature, humidity and cleanroom conditions, contributing to consistent quality throughout our production process.”

Ms. Nguyen Thi Tu Anh
CEO, Hai Duong Pharmaceutical & Medical Supplies JSC (HDPHARMA)

“In electronics manufacturing, stability and precision are essential. Durate met our expectations with high-quality HVAC equipment and a professional technical support team. We regard Durate as a reliable partner for our production operations.”

Mr. Jeon Se Hyung
Director, Lattron Vina Co., Ltd.

“What impressed us most about Durate is how quickly they respond to technical requests while still keeping the project on schedule. The HVAC system runs reliably and their technical team coordinated very well, delivering a solution suited to the demanding environment of electronic component manufacturing.”

Mr. Yun Myung Won
CEO, Dooco Vina Co., Ltd.

“We always look for long-term partnerships with companies that bring both technical capability and commitment. Durate not only supplies high-quality HVAC systems but also provides timely technical support, ensuring stable operation and meeting the demanding environmental requirements of cosmetics manufacturing.”

Ms. Vu Thi Thuy Linh
Chairwoman of the Board & CEO, Vimac Cosmetics JSC

SEND SPECS — GET QUOTE IN 24 HOURS